dsmc q sched command
 
*
Welcome, Guest. Please login or register. January 08, 2009, 10:17:21 PM


Login with username, password and session length


Pages: [1]   Go Down
  Print  
Author Topic: dsmc q sched command  (Read 412 times)
0 Members and 1 Guest are viewing this topic.
jasdeepsingh_07
New Member
*
Posts: 2


« on: October 03, 2008, 05:59:13 AM »

Hi All
There are two TSM in my project.I would like to refer them as TSM_1 and TSM_2.Now, there is an FS incremental backup scheduled daily on both servers.For TSM_1, the backup session is scheduled on TSM_2 as TSM server.And for TSM_2 with TSM_1.The log file generated after backup completion shows successful completion of backup for both servers.
Thus, no issues with backup completion on either of them.
But when I run the following command:
#dsmc q sched
I get the following message in the end of the output.
There are no schedules associated with this node
On both TSM servers.
How can I fix this discrepency as the compliance script in my environment checks this stanza from the above-mentioned dsmc command also why does the command give this message when backup is scheduled and completes successfully.

Thanks in advance.
Logged
Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC

Valid XHTML 1.0! Valid CSS! Dilber MC Theme by HarzeM
Page created in 0.691 seconds with 19 queries.




eXTReMe Tracker

Terms of Use and Privacy and Security Policies
Copyright 2001-2008 Michael Felt and ROOTVG.NET